AboutCollectionsAdd a ReportContact
 

RL34179
Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress
July 01, 2008

Download Locations:

Open CRS (User submitted)

Summary:

The Navy is currently developing technologies and studying design options for a planned new cruiser called the CG(X). The Navy wants to procure 19 CG(X)s as replacements for its 22 existing Ticonderoga (CG-47) class Aegis cruisers. The Navy wants the CG(X) to be a highly capable multi-mission ship with an emphasis on air defense and ballistic missile defense (BMD). The Navy has not yet announced a preferred design concept for the CG(X). Observers were expecting the Navy to announce a preferred design concept in late 2007/early 2008, but such an announcement is now expected to occur no earlier than late 2008/early 2009. The Navy originally intended to use the design of its new DDG-1000 destroyer as the basis for the CG(X) design, but it is no longer clear that this is still the Navy's preferred approach. Although the Navy's FY2009 budget calls for procuring the first CG(X) in FY2011, some press reports speculate that, as a result of the Navy's delay in announcing a preferred design for the CG(X), the Navy, as part of its FY2010 budget submission next year, may defer the scheduled procurement of the lead ship to FY2012 or a later fiscal year. Section 1012 of the FY2008 defense authorization act (H.R. 4986/P.L. 110-181 of January 28, 2008) makes it U.S. policy to construct the major combatant ships of the Navy, including the CG(X), with integrated nuclear power systems, unless the Secretary of Defense submits a notification to Congress that the inclusion of an integrated nuclear power system is not in the national interest. The Navy has studied nuclear power as a design option for the CG(X), but has not yet announced whether it would prefer to build the CG(X) as a nuclear-powered ship. Procurement of a nuclear-powered CG(X) in FY2011 would, under normal budgeting practices, involve funding the ship's long-leadtime nuclear-propulsion components in FY2009. The Navy's proposed FY2009 budget requests $370 million for research and development work on the CG(X). The Navy's proposed FY2009 budget does not request any advance procurement funding for the first CG(X). The House Armed Services Committee, in its report (H.Rept. 110-652 of May 16, 2008) on the FY2009 defense authorization bill (H.R. 5658), recommended approval of the Navy's FY2009 funding request for research and development work on the CG(X). The Senate Armed Services Committee, in its report (S.Rept. 110-335 of May 12, 2008) on the FY2009 defense authorization bill (S. 3001), recommended reducing the Navy's FY2009 funding request for research and development work on the CG(X) by $120.8 million. The report stated that, due to the Navy's continued review of the CG(X) Analysis of Alternatives (AOA), CG(X) program activities planned for FY2008 and FY2009 cannot be executed according to the schedule in the FY2009 budget request. This report will be updated as events warrant.

 

Available Versions:

November 18, 2008
October 27, 2008
August 11, 2008
July 01, 2008
May 23, 2008
March 21, 2008
September 20, 2007